U Beam/Box Beam Assembling Machine
This is the special equipment for bottom plate ,web plate and baffle plate of box beam .It is composed of main machine, roller conveyor, centering device, positioning device, hydraulic system and electric control box .
1.The two moving boom have one motor reducer for each, driving the four moving wheel working ,which form double driving system and make sure working stable.
2.It adopts hydraulic system for clamping the work-piece with big clamping force.
3.For the up and down clamping oil cylinder, it adopts floating clamping cylinder, it has the advantage that the force of clamping work-piece won’t delivered to the conveyor, which can avoid the damage of conveyor due to the big clamping force for work-piece.
4.It adopts work-piece centering and positioning device, centering device and positioning device have one group 3pcs for each, staggered installed on the roller conveyor, which can realize the positioning and centering of work-piece.
5.The electric control system is composed of electric control box and operation box. The electric control box install on the platform, two operation boxes install on the two side of column. They are placed separately, which is convenient for operation.
Specifications:
Model |
UZJ12 |
Section size |
300×300mm2~1200×1200mm2 |
Length of work-piece |
4000~15000mm |
Thickness of work-piece |
20~80mm |
Max loading capacity |
20t |
Frame moving speed |
4/6 m/min |
Hydraulic system pressure |
14 MPa |
Left-right oil cylinder max working pressure |
15t |
Up oil cylinder max pressure |
30 t |
Left-right oil cylinder max stroke |
800 mm |
Up oil cylinder max stroke |
900 mm |
Moving motor power |
0.85/1.1kw×2 |
Pump station motor power |
11 kw |
Roller conveyor motor power(single machine no roller conveyor) |
2.2 kw |
Roller conveyor conveying speed |
9.3 m/min |